2000字范文,分享全网优秀范文,学习好帮手!
2000字范文 > The bridge in the floods last year has been rebuilt and traffic will soon return.A. hurtB.

The bridge in the floods last year has been rebuilt and traffic will soon return.A. hurtB.

时间:2021-09-26 21:42:59

相关推荐

The bridge in the floods last year has been rebuilt and traffic will soon return.A. hurtB.

问题补充:

The bridge in the floods last year has been rebuilt and traffic will soon return.

A. hurt

B. injured

C. destroyed

D. affected

答案:

A. hurt

B. injured

(答案→)C. destroyed

D. affected

解析:句意:去年在洪水中被毁坏的桥已经重建,交通不久就会恢复了。Hurt疼的 injured受伤 destroyed毁坏 affected影响,选C。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。