2000字范文,分享全网优秀范文,学习好帮手!
2000字范文 > 超长大管棚 ultra long and large pipe shed英语短句 例句大全

超长大管棚 ultra long and large pipe shed英语短句 例句大全

时间:2020-02-19 19:10:04

相关推荐

超长大管棚 ultra long and large pipe shed英语短句 例句大全

超长大管棚,ultra long and large pipe shed

1)ultra long and large pipe shed超长大管棚

2)overlength pipe shed超长管棚

1.The vehicle tunnels adopt box culvert advancing scheme underoverlength pipe shed,which is the first case to underpass the west L-taxiway of Beijing Capital International Airport without suspending air service during construction in China.为研究施工工法的可行性,针对超长管棚施作、开挖导洞布设下滑道、长大箱涵顶进等主要工况进行数值模拟,重点对典型施工工况引起滑行道地表沉降变形特征和规律进行分析研究。

3)long and large pipe shed长大管棚

1.The application oflong and large pipe shed method in treating carbon-based phyllite collapse长大管棚法在处理炭质千枚岩坍方中的应用

英文短句/例句

1.The application of long and large pipe shed method in treating carbon-based phyllite collapse长大管棚法在处理炭质千枚岩坍方中的应用

2.Long and Large Pipe Shelf Construction Method in Overburden at Lower Horizontal Section of Penstock at Liziping Hydropower Station栗子坪水电站压力管道下平段覆盖层长大管棚施工技术

3.Effects of Different Fertilizer and Water Management on Grape Growth and Fruiting under Protected Cultivation;不同肥水管理措施对大棚葡萄生长结果的影响

4.Long pipe awning construction technology of Shanghuyu tunnel for MaLai highway马莱高速上虎峪隧道长管棚施工技术

5.Effects of Reformed Plastic Tunnel on Environmental Factorsand China Rose Cut-flower Growth大棚改造对棚内环境因子及月季切花生长的影响

6.The Key Technology Researches of the Large Section Pipe Roof-box Jacking Method;浅埋大断面管棚—箱涵法关键技术研究

7.Application of Advanced Support Technique with Large Diameter Long Pipe Roof at Huayuan East Road Station of Beijing Subway #10 Line大直径长管棚超前支护技术在北京地铁10号线花园东路站中的应用

8.The application of long pipe roof technique in Yipoling tunnel construction长管棚技术在艺坡岭隧道施工中的应用

9.Construction Technology of Pipe Roof Support for Underground Passage of Changchun Railway Station长春火车站南北地下通道管棚支护施工工艺

10.Application of big pipe shed and pre-grouting small pipe supporting in tunnels大管棚和超前注浆小导管支护在隧洞中的应用

11.The Experimental Study on Laws of Seepage with Zippered Plastic Pipe Andpercolaction Irrigation Inside the Shelf;拉链式塑料管渗流规律与大棚渗灌的试验研究

12.Epidemiological investigation of vegetable greenhouses bronchial asthma in rural shandong山东农村蔬菜大棚性支气管哮喘流行病学调查

13.The construction method of talus shallow tunnel advanced support large pipe shed堆积体浅埋隧道超前支护大管棚施工方法

14.Application of leading steel pipeline shed previous timbering technology in Haikedao tunnel超前大管棚预支护技术在海客道隧道中的应用

15.Applied technology of large-pipe-shelf grout injection through mylonite fault zone大管棚注浆法穿越糜棱岩断层带的应用技术

16.Application Idea of GIS in the Greenhouse Production Management SystemGIS在温室大棚生产管理体系中的应用构想

17.Advanced large-pipe-shed construction technology of Guanyintang tunnel under crossing Lian-Huo expressway观音堂隧道下穿连霍高速公路超前大管棚施工

18.Studies on the Function and the Planting-effect of a Single-covered and a Double-covered Plastic Shed in Changsha;长沙地区单、双层塑料大棚性能和栽培效果的研究

相关短句/例句

overlength pipe shed超长管棚

1.The vehicle tunnels adopt box culvert advancing scheme underoverlength pipe shed,which is the first case to underpass the west L-taxiway of Beijing Capital International Airport without suspending air service during construction in China.为研究施工工法的可行性,针对超长管棚施作、开挖导洞布设下滑道、长大箱涵顶进等主要工况进行数值模拟,重点对典型施工工况引起滑行道地表沉降变形特征和规律进行分析研究。

3)long and large pipe shed长大管棚

1.The application oflong and large pipe shed method in treating carbon-based phyllite collapse长大管棚法在处理炭质千枚岩坍方中的应用

4)leading steel pipeline shed超前大管棚

1.The application ofleading steel pipeline shed previous timbering technology in Dongtian tunnel;超前大管棚预支护技术在东田隧道中的应用

5)long pipe-shed pre-reinforcement长管棚超前支护

1.With the construction case of 65mlong pipe-shed pre-reinforcement,the paper introduced the construction technology of long pipeshed with Haiwangxing-508 drilling machine,and discussed the feature requirement of drilling machine in the construction.结合65 m长管棚超前支护的施工实例,介绍了海王星-508型钻机在长管棚施工中采用的施工工艺,并探讨了长管棚施工对钻机的性能要求。

6)large-scale lead pipe grouting超前大管棚注浆

1.By means of water drainage and blockage, and withlarge-scale lead pipe grouting technology, the tunnel goes through the poor geology zone smoothly.吊钟岩隧道DK250+130处,隧道拱部突发涌水、涌泥石,造成掌子面堆积,采用排堵水和超前大管棚注浆相结合的施工技术,顺利通过了该不良地质地段。

延伸阅读

棚长1.清代军队中一棚之长。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。