2000字范文,分享全网优秀范文,学习好帮手!
2000字范文 > 便桥 temporary bridge英语短句 例句大全

便桥 temporary bridge英语短句 例句大全

时间:2022-06-02 23:18:49

相关推荐

便桥 temporary bridge英语短句 例句大全

便桥,temporary bridge

1)temporary bridge便桥

1.Initial analysis oftemporary bridge reinforcement scheme in construction of Chang-Yuan line Hongqi Bridge长原线红旗大桥施工便桥加固方案浅析

2.To meet the transportation needs of concrete in construction site, atemporary bridge should be constructed near the upper reaches of 8~9# pillar place in construction of the 1# bridge reposes left line in Niekou approach span in the north of the Changjiang river of Tianxingzhou bridge.在武汉天兴洲大桥铁路江北引桥滠口左线引桥1#桥施工中,为满足施工现场混凝土运输的需要,采取以下措施:8~9#墩处上游附近搭设施工便桥1座;便桥桥面板采用2500×1000×200mm钢筋混凝土槽型板;纵向主梁采用8片H600×200mm型钢横向排列,且每两片一组用1cm厚钢板进行抱箍;每墩采用2片36a工字钢做横抬梁;便桥基础采用钢管排桩基础。

英文短句/例句

1.the Old B -伦敦中央刑事法院活动便桥, 军用轻便桥

2.The Design of Temporary Construction-Convenience Bridge for Liuxia to Wangjiapu Elevated Bridge留下至汪家埠段高架桥施工便桥设计

3.Design on Temporary Steel Bridge of Qingkou River Superlarge Bridge on Provincial Road Line 242242省道青口河特大桥钢便桥设计

4.Designing Temporary Bridge for Railroad Approach Span in the North of the Changjiang River of Tianxingzhou Bridge天兴洲大桥江北铁路引桥施工便桥设计

5.Initial analysis of temporary bridge reinforcement scheme in construction of Chang-Yuan line Hongqi Bridge长原线红旗大桥施工便桥加固方案浅析

6.the rude bridge that arched the flood(bRalph Waldo Emerson)架于洪水上的便桥(b拉尔夫 沃尔多 埃默森)

7.the rude bridge that arched the flood(Ralph Waldo Emerson)架于洪水上的便桥(拉尔夫 沃尔多 埃默森)

8.Study on Application and Numerical Analysis of Temporary Steel Bridge for Traffic Organization in the Metro Station;地铁车站交通疏解钢便桥应用及数值分析研究

9.I can construct bridges which are very light and strong and very portable.我能建造轻便、坚固、搬运便利的桥梁。

10.As he got there, he took his stand at one end of the bridge and waited.他到了那儿以后,便站在桥的一头等着。

11.The boys traversed a small hump-backed bridge to the opposite shore.两个人便走上窄小的圆拱桥,到了对岸。

12.The boat then passed under the hump-backed bridge and approached the near bank.那只船便穿过圆拱桥慢慢地向前驶去。

13.Beam reinforcement work will be top-line technology into large-span bridges and culverts工便梁加固线路顶进大跨度桥涵技术

14.On the application of type D beam in the frame railway bridgesD型便梁在铁路框架桥施工中的运用

15.A bridge that can be raised or drawn aside either to prevent access or to permit passage beneath it.吊桥可以提升、放下或拉到边上以便通行或阻断的桥

16.On their reaching the courtyard he instinctively altered his tread, as being in expectation of a drawbridge;才下到天井里,他便本能地改变了步态,好像预计着前面便是吊桥。

17.It would be wrong to conclude this examination of the data bridge without some acknowledgment of another reality.如果不了解另外一个事实便结束对数据桥梁的调查便会铸成错误。

18.After that he led the cow across the bridge onto the roof.一切就绪后,他便引领那头乳牛走过桥到屋顶上。

相关短句/例句

auxiliary bridge便桥

bined with the construction practice,from five aspects,the paper analyzed the technical plan of erectingauxiliary bridge in the tunnel for reference.结合陕西省宁棋公路棋盘关隧道仰拱的施工实例,从技术、安全、质量、工期、效益5个方面进行综合分析比较,提出了在隧道内架设便桥的技术方案,取得了良好的效果。

3)temporary bridge临时桥,便桥

4)Temporary steel bridge钢便桥

1.The research on design and construction scheme of old Feihe River temporary steel bridge shows that the design scheme is successful.关于老淝河钢便桥设计和施工方案的研究表明,其设计方案是成功的,可为类似工程提供借鉴。

2.This article took temporary steel bridge for traffic organization during construction in the first stage of under—construction Nanjing Metro Line 2.本文以在建南京地铁二号线一期工程新街口车站施工期地面交通疏解所采用的钢便桥为工程背景。

3.This paper presents the application of temporary steel bridge as the access of construction machineries and vehicles.本文主要介绍了利用钢便桥在工程施工中解决机械设备难以进入施工现场等问题时的应用,结合工程实例对钢便桥施工进行介绍,并对钢便桥进行相关受力验算。

5)steel temporary bridge钢便桥

1.Design analysis ofsteel temporary bridge of Xinjiekou metro;新街口地铁施工用钢便桥设计分析

2.A new way that bothsteel temporary bridge supported by the primary piers and the simple-supported beam bridge work together to bear the heavy loa.提出了一种利用原桥墩、台架设临时钢便桥与原桥组合受力共同承担大件通过的运输方案。

3.With Wajingou 2# Bailey beamsteel temporary bridge in Jiangbian Power Station as the design and construction example,it is introduced the practical structure and the mechanical checking of thesteel temporary bridge which is mainly used for transporting ballast piling in the tunnels.通过江边电站挖金沟2号贝雷梁便桥的设计施工实例,对以解决隧道弃碴运输为主的钢便桥的实用结构和力学验算进行了介绍,特别是受现场场地制约和湍急河流条件的贝雷梁的索吊架设进行了重点介绍,对同类工程施工组织具有参考价值。

6)make-shift bridge临时便桥

延伸阅读

便桥临时架设的简便的桥。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。