2000字范文,分享全网优秀范文,学习好帮手!
2000字范文 > 天生桥二级水电站 Tianshengqiao Second cascade Hydropower Station英语短句 例句大全

天生桥二级水电站 Tianshengqiao Second cascade Hydropower Station英语短句 例句大全

时间:2018-11-22 20:05:51

相关推荐

天生桥二级水电站 Tianshengqiao Second cascade Hydropower Station英语短句 例句大全

天生桥二级水电站,Tianshengqiao Second cascade Hydropower Station

1)Tianshengqiao Second cascade Hydropower Station天生桥二级水电站

1.4 generating unit of theTianshengqiao Second cascade Hydropower Station, which caused the generating unit to reject the load of 220 MW.天生桥二级水电站 4号机组于 1999年接连二次发生低油压事故 ,致使机组甩掉 2 2万kW负荷。

2.6 generating unit ofTianshengqiao Second cascade Hydropower Station, a quick installation method in keeping with technical requirements has been created, including stator welding, adjustment, positioning rod spot welding, steel sheet lamination, etc.在天生桥二级水电站 6号发电机定子现场安装中 ,对机座组焊、调整、定位筋点焊固定、铁片叠装压紧等创造了 1套快捷、确保技术要求的安装方法。

3.6 generating unit ofTianshengqiao Second cascade Hydropower Station, the Project Department strengthened project management and created the stage centralized principles.在天生桥二级水电站Ⅱ级工程的 6号机组安装中 ,项目部加大了管理力度 ,创造了阶段性集中原则 ,合理调配人力资源 ,采用弹性管理手段 ,施工计划科学 ,施工组织设计和技术措施切实可行 ,并运用新技术、新工艺 ,确保质量体系的认真运作。

英文短句/例句

1.A Report about the Fabricating Penstocks for the Seepage Tunnel of Tianshengqiao Hydroelectric Power Station;天生桥二级水电站三号引水隧洞压力钢管制作

2.Experiment on shutting of emergency overhaul gate in surge shaft of Tianshengqiao cascade II hydropower station天生桥二级水电站事故检修闸门动水下门试验

3.The Design and Construction of RCC Dam in Tianshengqiao-Ⅱ Hydropower Station天生桥二级水电站碾压混凝土坝的设计与施工

4.Treatment of Unsettled Problems on Resident Relocation of Tianshengqiao Ⅱ Hydropower Station;天生桥二级水电站移民遗留问题的对策研究

5.Treatment of Cracks on Runner Blade of Turbines In Tianshengqiao Hydropower Station天生桥一级电站水轮机转轮裂纹处理

6.Study on Aeration Mitigation of Cavitation for the Spillway of TIANSHENGQIAO-1 Hydropower Station;天生桥一级水电站溢洪道掺气减蚀研究

7.Treatment of Over Vibration in 4# Unit of TSQ-1 Hydropower Station天生桥一级水电站4号机组振摆超标的处理

8.Reformation of Protection against Lightning for the Safety Monitoring Automation System for Diversion Tunnel in TSQ Ⅱ Hydropower Station天生桥Ⅱ级水电站引水隧洞安全监测系统防雷改造

9.Choice and Similarity Calculation of Ventilation System for Hydrogenerator of Tian Shengqiao Water Power Station StepⅡ天生桥Ⅱ级电站水轮发电机通风系统选择及相似计算

10.Plague focus investigation in the region of Tianshengqiao reservoir in Guizhou贵州省天生桥水电站库区沿岸鼠疫疫源地调查

11.Ertan hydropower station is the first power station built on Yalong River.二滩水电站是雅砻江梯级开发的第一个水电站。

12.Study on Eco-Environmental Water Demand about the Segment of Water Reduced for the Jinping Second Class Hydropower Station of Yalong River;雅砻江锦屏二级水电站减水河段生态环境需水研究

13.INVESTIGATION OF ENGINEERING SETTLEMENT AND PAYMENT IN THE CONTRACT OF THE TIANSHENGQIAO HYDROPOWER PROJECT;天生桥水电站工程承包合同的工程结算支付探析

14.Design and Practice of Plastic Concrete Anti-Seepage Wall in the Auxiliary Dam Foundation of Tianshengqiao Hydropower Station天生桥水电站副坝基础塑性混凝土防渗墙设计与实践

15.Study on the layout pattern of new spillway structure of Tianqiao hydropower station天桥水电站新增泄水建筑物布置型式研究

16.Study on the Hydraulic Characteristics of Jinping Cascade-II Hydropower Station with Long Diversion Tunnel锦屏二级水电站长引水隧洞水力特性研究

17.Preliminary Research on the Navigational Condition Influenced by Tian Qiao Hydroelectric Station During Daily Regulation天桥水电站日运行方式对航运影响的初步研究

18.Rock Classification of Diversion Tunnel Study of Jinping Ⅱ Hydropower Station in Yalong River雅砻江锦屏二级水电站引水隧洞围岩分类研究

相关短句/例句

Tianshengqiao-Ⅱ Hydropower Station天生桥二级水电站

1.Analysis of the Breast Wall Collapse of the Surge Shaft ofTianshengqiao-Ⅱ Hydropower Station;天生桥二级水电站调压井闸门井胸墙闸墩倒塌事故分析

3)Tianshengqiao Hydropower Station Ⅱ天生桥二级水电站

1.Study and Analysis on Operation at Head of Pivot ofTianshengqiao Hydropower Station Ⅱ;天生桥二级水电站首部枢纽运行分析与研究

2.Layout of Monitoring System Set up on the Slope of Powerhouse ofTianshengqiao Hydropower Station Ⅱ;天生桥二级水电站厂房边坡监测系统布置

4)Tian-shengqiao Ⅱ (Basuo) Hydropower Station天生桥二级(坝索)水电站

5)GIB earth-fault天生桥二级电站

1.The paper introduces distinguishing, seeking and treating of 220 kVGIB earth-fault inTianshengqiao Hydropower station Ⅱ.介绍天生桥二级电站220kVGIB接地故障的判别查找及处理方法。

6)Tianshengqiao No.1 hydropower reservoir天生桥一级水电站水库

1.According to 1987 and 2002 TM images of the surrounding region of Tianshengqiao No.采用天生桥一级水电站水库库周1987年和2002年两景TM遥感影像,进行建库前后土地覆盖变化分析,绘制出相应的土地利用图。

延伸阅读

天生桥Ⅰ级水电站

天生桥Ⅰ级水电站

Tianshengqiao Ⅰ HydropowerStation概述 天生桥Ⅰ级(坝盘)水电站位于中国贵州省安龙县和广西壮族自治区隆林县交界处、珠江水系西江干流南盘江上。坝址左岸属贵州安龙县,右岸属广西隆林县,上游距南盘江支流黄泥河上的鲁布革水电站约90km,下游距天生桥Ⅱ级水电站7km。电站东北向距贵阳市的直线距离为240km,西距昆明市250km。天生桥Ⅰ级水电站以发电为主,装机容量120万kW,保证出力40.52万kW,多年平均发电量52.26亿kW·h。电站建成后,还可提高下游天生桥Ⅱ级、岩滩和大化水电站的保证出力88.89万kW,增加年发电量40.77亿kW·h。库区淹没耕地4539hm2,迁移人口4.43万人。工程于1991年4月正式开工,1994年12月25日截流,1998年12月第一台机组发电。 坝址以上集水面积50139km2,坝址多年平均径流量193亿m3,多年平均流量612m3/s;多年平均悬移质输沙量1578万t,推移质输沙量70万t。主体工程按千年一遇洪水设计,相应流量20900m3/s,库水位782.87m,相应泄流量15282m3/s;按可能最大洪水校核,入库流量28500m3/s,相应库水位789.86m,相应下泄流量21750m3/s。水库系山区峡谷型水库,正常蓄水位780m,死水位731m,总库容102.57亿m3,有效库容58亿m3,具有不完全多年调节能力。电站最大工作水头143m,最小工作水头83m,设计水头126.65m。 大坝座落在由石灰岩、砂岩、泥岩及泥灰岩组成的岩层上。坝址区地震基本烈度为6度,设计烈度为7度。枢纽布置工程由混凝土面板堆石坝、右岸放空隧洞及开敞式溢洪道、左岸引水系统及厂房等建筑物组成。 混凝土面板堆石坝,坝顶高程791m,防浪墙顶高程792m(墙高4.7m,露出坝顶1m),最大坝高178m,坝顶长1137m,坝顶宽12m,上下游坝坡均为1∶1.4。 溢洪道布置在右岸垭口处,全长1665m,其中引渠长1122m,引渠底宽120m,底部高程745m,引渠最大泄流量21750m3/s,最大流速3.8m/s。渠道两侧为垂直边坡,每隔22m设12m宽的马道,不衬砌。引渠后紧接溢流堰,堰顶高程760m,设5孔弧形闸门,孔口宽13m、高20m。堰后为陡槽,槽长538m,中间设隔墙将陡槽分左、右两槽。左槽3孔,净宽47m,右槽净宽30m。槽后接挑流鼻坎,挑角45°,半径50m。泄槽用钢筋混凝土衬砌,设有5道掺气槽。 放空隧洞置于右岸坝肩,进口底坎高程660m,全长1062.17m,前段为有压隧洞,长557.67m,圆形断面,内径9.6m;后段为无压隧洞,长489.5m,方形断面,宽×高为8m×11m。距进口339.17m处设事故闸门井,井高131m,内径11m,内设6.8m×9m事故平板定轮闸门,距进口560.67m有压隧洞末端为工作闸门室,设弧形工作门,尺寸为6.4m×7.5m。 引水道进口布置在坝上游左岸,进口尺寸长98m,宽27.5m,高79.5m,内设16扇拦污栅,1扇检修门及4扇事故门。进水口底板高程711.0m。引水道由4条内径9.6m、长551.49~652.86m的低压隧洞及其后的4条内径7~8.2m、长185m的高压钢管组成。 厂房为坝后地面式,顺河向布置,长145m,宽26m,高67m,内设4台单机容量为30万kW的混流式水轮发电机组,水轮机机型HLA330-LJ-530。变压器布置在上游侧副厂房屋顶上,发电机和变压器之间采用单独单元结线。 工程施工主要工程量:土石方开挖2655万m3,土石方填筑1913万m3(其中坝体1797万m3),混凝土132万m3,帷幕灌浆5.4万m,固结灌桨2.32万m,钢材总量61350t。采用隧洞导流方案。上下游围堰按一遇枯水期流量设计,流量1670m3/s,堰顶高程分别为651m和644.2m。截流后的第一个汛期,允许围堰和坝面过水(堰面用0.9m厚楔形混凝土块保护),与导流洞联合泄洪,泄洪标准按30年一遇设计,流量为10800m3/s。第二个汛期利用堆石坝体挡300年一遇洪水,导流洞和放空隧洞联合泄洪,流量17400m3/s,以后随坝体上升度汛标准逐年提高。1994年底截流。围堰过水9次,过水时最大流量为4800m3/s,大坝填筑实际工期为28个月,比设计工期少8个月,1997年9月~1998年6月平均月填筑强度为56万m3。其他1.混凝土面板堆石坝 天生桥Ⅰ级水电站的面板堆石坝是中国目前已建、在建的同类型坝中最高的一座。根据工程筑坝材料性质和面板坝的工作条件,坝体剖面分垫层料区、过渡料区、主堆石料区、砂泥岩堆石料区和下游堆石区。根据设计要求,垫层料最大粒径80mm,大于5mm颗粒含量为45%~65%,应达到的填筑标准是:相对密度0.8,相应干密度2.2g/cm3,孔隙率0.19。铺层厚0.4m,振动碾压6遍。过渡料采用溢洪道开挖的灰岩料,最大粒径300mm,铺层厚0.4m,振动碾压6遍。主堆石料采用溢洪道或采石场开挖的弱风化、微风化和新鲜灰岩料,最大粒径800mm,铺层厚0.8m,振动碾压6遍。砂泥岩堆石料采用微风化和新鲜岩石开挖料,允许最大粒径800mm,铺层厚0.8m,振动碾压6遍,下游堆石料采用灰岩开挖料,最大粒径1600mm,铺层厚1.6m,振动碾压6遍。 面板顶部厚30cm,底部最大厚度90cm,总面积15.6万m2,体积8.87万m3,面板混凝土标号为R250,B12,D100,设一层双向筋,含筋率0.3%~0.4%。面板设垂直缝,间距16m,坝肩分别有10和15条张性垂直缝,其余为压性垂直缝。垂直缝为平接硬缝,底部均为铜片止水,缝顶柔性填料止水仅用于张性垂直缝。面板分三期浇筑,在高程640m和725m处设水平缝。面板和趾板之间设周边缝。周边缝底部设铜片止水,中部PVC止水,顶部柔性止水,死水位以下的周边缝均用粘性土覆盖。 趾板建基面在弱风带内2m。最大宽度为10m,厚1m。在地形和地质条件变化处设缝,上部设一层双向钢筋。用钢筋和基岩连接。通过趾板进行灌浆,帷幕灌浆深度按单位吸水率0.03L/(min.m.m)确定,最大深度80m。对表层中等透水岩体进行固结灌浆。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。