天生桥二级水电站,Tianshengqiao Second cascade Hydropower Station
1)Tianshengqiao Second cascade Hydropower Station天生桥二级水电站
1.4 generating unit of theTianshengqiao Second cascade Hydropower Station, which caused the generating unit to reject the load of 220 MW.天生桥二级水电站 4号机组于 1999年接连二次发生低油压事故 ,致使机组甩掉 2 2万kW负荷。
2.6 generating unit ofTianshengqiao Second cascade Hydropower Station, a quick installation method in keeping with technical requirements has been created, including stator welding, adjustment, positioning rod spot welding, steel sheet lamination, etc.在天生桥二级水电站 6号发电机定子现场安装中 ,对机座组焊、调整、定位筋点焊固定、铁片叠装压紧等创造了 1套快捷、确保技术要求的安装方法。
3.6 generating unit ofTianshengqiao Second cascade Hydropower Station, the Project Department strengthened project management and created the stage centralized principles.在天生桥二级水电站Ⅱ级工程的 6号机组安装中 ,项目部加大了管理力度 ,创造了阶段性集中原则 ,合理调配人力资源 ,采用弹性管理手段 ,施工计划科学 ,施工组织设计和技术措施切实可行 ,并运用新技术、新工艺 ,确保质量体系的认真运作。
英文短句/例句
1.A Report about the Fabricating Penstocks for the Seepage Tunnel of Tianshengqiao Hydroelectric Power Station;天生桥二级水电站三号引水隧洞压力钢管制作
2.Experiment on shutting of emergency overhaul gate in surge shaft of Tianshengqiao cascade II hydropower station天生桥二级水电站事故检修闸门动水下门试验
3.The Design and Construction of RCC Dam in Tianshengqiao-Ⅱ Hydropower Station天生桥二级水电站碾压混凝土坝的设计与施工
4.Treatment of Unsettled Problems on Resident Relocation of Tianshengqiao Ⅱ Hydropower Station;天生桥二级水电站移民遗留问题的对策研究
5.Treatment of Cracks on Runner Blade of Turbines In Tianshengqiao Hydropower Station天生桥一级电站水轮机转轮裂纹处理
6.Study on Aeration Mitigation of Cavitation for the Spillway of TIANSHENGQIAO-1 Hydropower Station;天生桥一级水电站溢洪道掺气减蚀研究
7.Treatment of Over Vibration in 4# Unit of TSQ-1 Hydropower Station天生桥一级水电站4号机组振摆超标的处理
8.Reformation of Protection against Lightning for the Safety Monitoring Automation System for Diversion Tunnel in TSQ Ⅱ Hydropower Station天生桥Ⅱ级水电站引水隧洞安全监测系统防雷改造
9.Choice and Similarity Calculation of Ventilation System for Hydrogenerator of Tian Shengqiao Water Power Station StepⅡ天生桥Ⅱ级电站水轮发电机通风系统选择及相似计算
10.Plague focus investigation in the region of Tianshengqiao reservoir in Guizhou贵州省天生桥水电站库区沿岸鼠疫疫源地调查
11.Ertan hydropower station is the first power station built on Yalong River.二滩水电站是雅砻江梯级开发的第一个水电站。
12.Study on Eco-Environmental Water Demand about the Segment of Water Reduced for the Jinping Second Class Hydropower Station of Yalong River;雅砻江锦屏二级水电站减水河段生态环境需水研究
13.INVESTIGATION OF ENGINEERING SETTLEMENT AND PAYMENT IN THE CONTRACT OF THE TIANSHENGQIAO HYDROPOWER PROJECT;天生桥水电站工程承包合同的工程结算支付探析
14.Design and Practice of Plastic Concrete Anti-Seepage Wall in the Auxiliary Dam Foundation of Tianshengqiao Hydropower Station天生桥水电站副坝基础塑性混凝土防渗墙设计与实践
15.Study on the layout pattern of new spillway structure of Tianqiao hydropower station天桥水电站新增泄水建筑物布置型式研究
16.Study on the Hydraulic Characteristics of Jinping Cascade-II Hydropower Station with Long Diversion Tunnel锦屏二级水电站长引水隧洞水力特性研究
17.Preliminary Research on the Navigational Condition Influenced by Tian Qiao Hydroelectric Station During Daily Regulation天桥水电站日运行方式对航运影响的初步研究
18.Rock Classification of Diversion Tunnel Study of Jinping Ⅱ Hydropower Station in Yalong River雅砻江锦屏二级水电站引水隧洞围岩分类研究
相关短句/例句
Tianshengqiao-Ⅱ Hydropower Station天生桥二级水电站
1.Analysis of the Breast Wall Collapse of the Surge Shaft ofTianshengqiao-Ⅱ Hydropower Station;天生桥二级水电站调压井闸门井胸墙闸墩倒塌事故分析
3)Tianshengqiao Hydropower Station Ⅱ天生桥二级水电站
1.Study and Analysis on Operation at Head of Pivot ofTianshengqiao Hydropower Station Ⅱ;天生桥二级水电站首部枢纽运行分析与研究
2.Layout of Monitoring System Set up on the Slope of Powerhouse ofTianshengqiao Hydropower Station Ⅱ;天生桥二级水电站厂房边坡监测系统布置
4)Tian-shengqiao Ⅱ (Basuo) Hydropower Station天生桥二级(坝索)水电站
5)GIB earth-fault天生桥二级电站
1.The paper introduces distinguishing, seeking and treating of 220 kVGIB earth-fault inTianshengqiao Hydropower station Ⅱ.介绍天生桥二级电站220kVGIB接地故障的判别查找及处理方法。
6)Tianshengqiao No.1 hydropower reservoir天生桥一级水电站水库
1.According to 1987 and 2002 TM images of the surrounding region of Tianshengqiao No.采用天生桥一级水电站水库库周1987年和2002年两景TM遥感影像,进行建库前后土地覆盖变化分析,绘制出相应的土地利用图。
延伸阅读
天生桥Ⅰ级水电站