2000字范文,分享全网优秀范文,学习好帮手!
2000字范文 > 框架结构和砖混结构 the frame structure and masonry structure英语短句 例句大全

框架结构和砖混结构 the frame structure and masonry structure英语短句 例句大全

时间:2023-06-24 09:59:15

相关推荐

框架结构和砖混结构 the frame structure and masonry structure英语短句 例句大全

框架结构和砖混结构,the frame structure and masonry structure

masonry and frame structure砖混和框架结构

3)Masonry Building with Frame Structure at the First Story底部框架-上部砖混结构

4)frame and brick veneer construction框架嵌砖结构

5)The mixed structure of the underframe-brick底框-砖混结构

6)masonry structures supported by frame框支砖混结构

1.Based on our research results of more than ten years, antotal analysis is made of the affection of load action of general structures such as fame with added floors, castinsite slabbeam floors system, frame with fill-in walls andmasonry structures supported by frame.在总结土木建筑工程十余年科研工作成果的基础上,对泛用的一些结构,如加层框架、现浇肋形楼(屋)盖、框架-填充墙、框支砖混结构等进行整体作用(荷载)效应分析,提出若干有关设计计算、构造上值得注意的问题。

延伸阅读

多层厂房预制钢筋混凝土框架结构安装多层厂房预制钢筋混凝土框架结构安装installation of precast reinforced concrete frame structure for multilayer workshop building定.11 ~.。」:柱1一可下门- 杯形井礴11铆椒,甲丫一目一一丫位板沙父父护科月黔今了牛’J一一确r一一土- 二黑交哪嗯浮i钊粼减图“连接板埋设件连接法图1柱子固定示意图柱子四面的连接板和埋设件,然后进行连接板外表面 的刷油和涂装。由于混凝土的抗弯性能所限,混凝土柱不能过长。梁和板的安装在第一节柱安装完成后,及时将对较高的多层框架柱,一般都设计成多段,在预制厂分预制梁、板安装好,以尽快形成整体框架,保持结构的节制作,运至现场后,由安装者在高空对接成整根柱。稳定。梁与柱的连接多采用柱肩梁承接式,通过梁端头这种多节柱安装的关键在于柱与柱之间对接接口的施上下两面的埋设件与柱的埋设件焊接、固定(图4)。梁工,常用的接口型式有湿式连接(图2)和连接板埋设固定后,将预应力钢筋混凝土板座落在梁上,通过将大件连接(图3)两种。(1)湿式连接法。起吊前先实地板两端下边的埋设件与梁上面的埋设件焊接在一起,量测预留钢筋接头的尺寸,将接头调直,开好坡口;将将板固定起来(图5),使框架形成一个空间刚体。如接头处的混凝土面打毛处理,在柱头上事先系3一4根此逐层依次施工,直至完成多层厂房框架结构的全部缆绳,用于调整柱子就位后的垂直度。起吊后将上下柱安装工作的钢筋接头对准,并用两台经纬仪同时测量柱子相邻丁粉可-两面的垂直度,用缆绳进行校正。垂直度合格后进行对!」下称焊接,先焊接头支承面的钢板埋设件,再焊柱子四角!华卜一,一一洲二二的钢筋和全部对接钢筋,然后复核上下柱中心的垂直1七口,杏一一.州.去盛,度,若无偏差立即支模灌浆。(2)连接板埋设件连接法。IJ}}将柱子起吊后与下柱对准就位,并用两台经纬仪同时!//~测童校正相邻两面的中心线垂直度,合格后进行焊接。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。